Faema Lambro

Hello

Day’s work, polishing and assembly of the group Zodiaco, cleaning and assembling the flange on the boiler.

I was surprised to find a brass boiler cover under the grime, given the thinness I almost bet it was copper.

This Lambro surprises me every day, it’s a combination of technicals rather limits like those crummy aluminum flanges … and interesting things as the quality of the tank, its nice braze solder, and this beautiful plate.

 

Faema Lambro

Hello

I passed two coats of black paint on the frame last week. And also … I spent almost 8 hours to restore the  stainless steel facade. This stainless steel 18/8 is an horror to polish, it is both hard to attack for roughing, and at the same time very tender on its finishing coat, not easy to get a nice shine. It remained some traces of the past of the machine that I can not remove, it is very deep and it would make too much material to remove.

The group was very dirty, but unlike steel it is in fairly good condition, for once, I have done a before/after.

  You start to be a certain number to follow this humble blog, and this is very nice to know that one is a little read, thank you. Feel free to leave a comment, it’d be fun to do a little knowledge with my readers 😉

 

Faema President 2 groups

Here is a great adventure comes to its end.

After getting the boiler, and given the quality of work has been done on it, I could get up the machine with confidence. No more leak to report anywhere.

The coffees of this machine are really a very good quality, I want to say, but this is only my opinion, that Faema has it all with this group. I’m used to more body, more flavor perhaps also with my usual machines, but also more blame, “but it’s hard …. bah!” By people accustomed to sad quality of the majors in home appliances. Here we get a coffee that has the body, many flavors, but also a lot of sweetness and roundness.

Pascal

 Faema President par ChromesdantanFaema President par Chromesdantan

 

 

Faema President 2 groups

Something new under the sun

And not all good news …

At 11am this morning I had an appointment to solder the two small cracks in the boiler. At 15.30 I’ll get it back. The welder had two beautiful welds and the boiler was waiting in a corner of the workshop I came to retrieve it. I look at some work that was done and found that stainless steel has again cracked right next to the welds.

It was decided to take the bull by the horns, we conclude that we must weld a sheet of stainless steel across the weakened area to stop the progression of the disease, engagement took to 17.30.

At the appointed hour the professional get me back the tank at home, he really did a great job. But …. the disease is higher than expected, it still cracked side 🙁

It is still a new soldering iron next to the one already placed and I get the boiler tomorrow. I hope it’s going to blow it go because it’s the bottom of the boiler which has been mended.

I do not know exactly what to think about, a friend told me this morning the risks of poor grounding resistance and the risk of drilling tanks it is. I feel that there has been a long and bloody process of electrolysis, which attacked the metal gradually over the entire area below the item.

Nothing to worry too much though, the machine arrived there after almost 20 years of operation, with the thickness of sheet metal that is added with the welder, it should move at least 20 years again.

 

Faema President 2 groups

Hello everyone

It all started very well, a lot of work but no surprises.

In two days, I got my account … first, before yesterday, impounding of the machine, cold because I was still waiting last parts to finish the two groups.

I plumb the machine after checking that everything was tight and I gently open the water. I begin to fill the boiler and I have a leak to the flange of the machine, nothing serious, I tightened and it will be resolved.

Ditto for the HX  group left, down, it was not tight enough either.

I get to the water inlet valve and a leak on the arrival side, just after the valve which is connected to the hose. I must say that it lacks a bit of tightening and also is sending a bit of a key. It still leaks …. I tighten again but it still leaks, and rather more, I decided to take apart.

Final observation, the female fitting olive is split a bit of everywhere …

This is particularly annoying because this piece is no longer anywhere, it will therefore be necessary that I find a solution. I decided to change the connector fitting flat, which I add a joint. I cut the most damaged, then I grinded a dish. Solder to fill the last remaining micro cracks and re grinding to rebuild a correct range. Even the olive processing and assembly of the pipe. That is, I was a bit scared but finally it will not happen.

Yesterday I finally received the two piston pins that I missed to get all groups, then wound a little laborious, new pistons have been complicated to screw on the axes by compressing the springs, but it was finally done and groups are operational.

Last evening, the machine is hot, a small leak in the last connections thermosyphon groups and everything is ok. First coffee to rinse the machine then it is 22h so I decided to stop.

Today I put the machine on, I rinse a little more and decide to taste my first coffee, very happy to finally arrive at the end of this project. This afternoon, after dinner coffee will be taken on the machine and frankly, it’s really beautiful, the reputation of this group really is not stolen.

This afternoon, I put a little workshop, and at some point I fell not far from the machine, eye level with the bottom, I see a drop down, I go and there actually a small puddle under the boiler. Inspection, and it is a disaster …. there are two tiny pinholes in the bottom of the tank ….

I will have to take the boiler apart again and weld both holes by a specialist, I can not weld stainless steel and do not have the necessary equipment.

So … following the re re-assembly…

 

 

Faema President 2 groups

Hello

This morning I received the stainless steel screws, I finally got up the boiler, its flange and I replaced the original nuts that I used temporarily for the feet.

It’s long, I can not wait … I miss only the piston rods of the groups to be able to go back and start up the machine. Everything is ready, these parts are waiting on the grid bassinelle, I installed the system that will allow me to mount the new springs they do not jump me in the head, finally I’m on the starting block to finish 🙂

I mounted the heat element with a homemade Teflon seal.

The P-stat is in place, it is connected, while the beam is in place elsewhere, finally … there is only to …